Services

Our Services


Aeritage provides specification support at every phase of the project when specifying the brands in our portfolio. Think of us as your embedded product resource: consultative, detail-oriented, and genuinely invested in how the lighting performs in the finished space.

 

We provide deep, responsive support for the fixtures we represent – from preliminary sustainability reviews and budget guidance through submittals, code compliance, and field coordination. Your design intent drives everything. Our role is to make sure the products we represent are specified correctly, verified against your requirements, and delivered without surprises.

 

The earlier you bring us in, the more value we can add – to your timeline, your budget, and the integrity of the final installation.

Programming

Schematic Design

Design Development

Construction Documentation

Construction
Administration

1) Programming

Identification of sustainability goals.

 

Site walk takeoffs of existing spaces.

 

Code compliance evaluation.

 

Preliminary budget recommendations.

 

Initial scheduling guidance.

2) Schematic Design

Fixture placement recommendations relative to your design layout..

 

Conceptual design fixture recommendations.

 

Lighting direction guidance based on your design intent..

 

Presentation imagery.

 

3D / 2D CAD files.

3) Design Development

Preliminary fixture specifications.

 

Fixture verification against sustainability goals.

 

Verify fixture specifications against Basis of Design.

 

Write lighting fixture schedule.

 

Finish sample review.

 

Fixture sample review.

 

Refine fixture placement recommendations and installation details for represented products.

4) Construction Documentation

Confirm required code compliance of fixtures.

 

Fixture specification review with lighting controls consultant and electrical engineer.

 

Document coordination for sustainability requirements and certification(s).

 

Spec submittal packages for approval.

 

Finish approvals.

 

Preliminary budget figures.

5) Construction Administration

Submittal package final approvals.

 

Lighting package project bidding.

 

Coordination with approved procurement agent or distributor.

 

Custom and modified shop drawing coordination.

 

Installation documentation to electrical contractor.

 

Order management & shipping.

 

Electrical site walks in support of fixture installation.

 

Field support for installation, technical questions, etc.